editor 22 Marzo 2013 – Lettura: 1 minuto The two plants, Angosturas with an installed capacity of 36 MW and Madroñales with an installed capacity of 34 MW, are located in the municipalities of Campillos, Teba and Almargen © Riproduzione Riservata