editor 30 Dicembre 2014 – Lettura: 1 minuto With an installed capacity of 136 MW, Diego de Almagro, Lalackama and Chañares, are capable of generating over 330 GWh. A total investment of some 240 million US dollars was required to complete them. © Riproduzione Riservata